2nd Floor at Solid Track-II
Bill Cost
Actual Cost
Profit
Offer12345: Total : Tk.1,326,678 Material
0
0
0.00 %
Purchase : Total : Tk.837,225 Labour
0
0
0.00%
Bill123456: Total : Tk.0 Equipment
0
0
0.00%
Certify123: Total : Tk.0 Other
0
0
0.00 %
Pay 12345: Total : Tk.0 Overhead
0
0
0.00 %
oh: 2.5% Profit:8.0% vat:4.0% it:4.5 % Total Profit =