2nd Floor at Solid Track-II |
Bill Cost |
Actual Cost |
Profit |
 |
Offer12345: |
Total : Tk.1,326,678 |
Material |
0
|
0 |
0.00
% |
Purchase : |
Total : Tk.837,225 |
Labour |
0 |
0 |
0.00%
|
Bill123456: |
Total : Tk.0 |
Equipment |
0 |
0 |
0.00%
|
Certify123: |
Total : Tk.0 |
Other |
0 |
0 |
0.00
% |
Pay 12345: |
Total : Tk.0 |
Overhead |
0 |
0 |
0.00
% |
oh: 2.5% Profit:8.0%
vat:4.0% it:4.5 % |
Total Profit = |