BREAKDOWN OF UNIT PRICE
Item:2225. RCC Frame for Door/ Window
Basis:17rft
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
0.480
bag
440.00
211.20
Sub-Total(A2)
211.20
39.99
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Stone-chips-6 mm down
1.000
cft
155.00
155.00
Sub-Total(A3)
155.00
29.35
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.1.2)
0.650
cft
19.00
12.35
Sand (F.M.2.2)
0.650
cft
53.80
34.97
Sub-Total(A4)
47.32
8.96
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Rod 400 grade/ 60 grad
6.140
kg
72.00
442.08
Sub-Total(F2)
442.08
83.70
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
0.250
No.
550.00
137.50
Mason
0.250
No.
700.00
175.00
Skilled Labour
0.250
No.
600.00
150.00
Rod Binder
0.250
No.
700.00
175.00
Helper
0.250
No.
550.00
137.50
Sub-Total(L1)
775.00
146.73
L3.Work Rate i/c Materi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Formwork/Shuttering-Steel
17.330
rft
3.50
60.66
Mechanical Vibration
1.000
LS
100.00
100.00
Sub-Total(L3)
160.66
30.42
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
GI Wire
0.100
kg
120.00
12.00
Iron Hinge-100mm
4.000
Nos.
49.00
196.00
Sub-Total(M1)
208.00
39.38
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.250
LS
550.00
137.50
Sub-Total(M2)
137.50
26.03
Total(1)
404.54
Add over head on Total(1)
3.5 %
14.16
Add Profit on Total(1)
10.0 %
40.45
Total(2)
459.15
Add VAT on Unit Price
7.5 %
37.23
Unit Price
496.38
Say
496
per metr