02 EXCAVATION, FILLING, SITE DEVELOPMENT AND PALASIDING
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
020101 Earthwork in Excavation-Layout sqm
26.00
32
020102 Excavate 1.5m depth 10m lead cum
157.00
193
020103 Excavat addl 0.5m exceed 1.5m dpt cum
26.00
32
020104 Excavat addl 1m beyond 10 m lead cum
4.00
5
020105 Excavat upto 2 m depth cum
87.00
107
020106 Excavate 4.5-6 m depth cum
112.00
137
020107 Excavate 9-9.3 m depth cum
131.00
161
0202 Bailing out water during excavatn hr
374.00
459
0203 Driving bamboo post 75mm dia metr
74.00
91
0204 Wooden Bollah drive in palasiding metr
525.00
644
0205 Palasiding drum sheet excl post sqm
528.00
648
0206 Hor bracing wooden bollah-1/2spl metr
195.00
239
020701 Shore protection-excavation-1.5m sqm
581.00
713
020702 Shore protection excv beyond 1.5 sqm
858.00
1053
0208 Geotextile-filled earth protectn sqm
182.00
223
0209 Remove Sludge, Sand-FM.8=1:10 cum
952.00
1168
021001 Sand Filling-F.M.=0.5 cum
909.00
1115
021002 Sand Filling-F.M.=0.8 cum
973.00
1194
021003 Sand Filling-F.M.=1.2 cum
1354.00
1661
021004 Sand Filling-F.M.=2.2 cum
3191.00
3915
021005 Quarry/ Crusher Dust Filling cum
4798.00
5887
0211 Khoa Consolidation-Khoa:LSand=2:1 cum
4897.00
6009
0212 Khoa Cons-Cement:sand:khoa=1:6:12 cum
5480.00
6724
0213 Earth Filling with earth availabl cum
194.00
238
0214 Clearing, disposal earth by truc cum
705.00
865
0215 Earth Filling by carted by truck cum
596.00
731
021601 Site Develop by carted by truck cum
640.00
785
021602 Site Develop by dredging cum
421.00
517
0217 Mechanical Compaction of Earth cum
198.00
243
021801 ExcavationPond-Lead 30m,lift-1.5m cum
229.00
281
021802 ExcavatPond-Addl lift 0.3m,1.5-3m cum
8.00
10
021803 ExcavatPond-Addl lift 0.3m,3-4.5m cum
12.00
15
021804 ExcavatPond-Addl lift 0.3m,4.5-6m cum
17.00
21
021805 ExcavatPnd-Addl lead-03m >30m cum
31.00
38
021901 Bail-out water-1 cusec DieselPump hour
586.00
719
021902 Bail-out water-1 cusec ElectrPump hour
511.00
627