BREAKDOWN OF UNIT PRICE
Item:0814030. Carriag Material Head Load:0-250m
Basis:1cum
83.Labour-3a
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Labour, Unskill/ Ordinary
0.006
no.
550.00
3.30
Sub-Total(83)
3.30
3.30
Total(1)
3.30
Add over head on Total(1)
3.5 %
0.12
Add Profit on Total(1)
10.0 %
0.33
Total(2)
3.75
Add VAT on Unit Price
7.5 %
0.30
Unit Price
4.05
Say
3.91
per m3/m