BREAKDOWN OF UNIT PRICE
Item:1230000. Construct Dewater Pump well 1-1.5
Basis:1no.
10.Material-Brick1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Bricks, Picked Jhama
666.000
No.
13.00
8658.00
Sub-Total(10)
8658.00
8658.00
13.Material-3
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand, FM>=2.5
1.570
cum
1900.00
2983.00
Sub-Total(13)
2983.00
2983.00
41.Metal-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Drum Sheet
5.200
sqm
260.00
1352.00
Sub-Total(41)
1352.00
1352.00
47.Steel-7
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Welding Arc per m
4.500
m
180.00
810.00
Sub-Total(47)
810.00
810.00
83.Labour-3a
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Head Man
0.011
no.
800.00
8.80
Labour, Skilled
5.680
no.
600.00
3408.00
Labour, Unskill/ Ordinary
6.121
no.
550.00
3366.55
Sub-Total(83)
6783.35
6783.35
Total(1)
20586.35
Add over head on Total(1)
3.5 %
720.52
Add Profit on Total(1)
10.0 %
2058.64
Total(2)
23365.51
Add VAT on Unit Price
7.5 %
1894.50
Unit Price
25260.01
Say
25260.20
per each