BREAKDOWN OF UNIT PRICE
Item:1612020. Construction Embankment 4m 85%com
Basis:1cum
22.Misc-2
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Diesel/ Fuel
0.191
ltr
109.00
20.82
Sub-Total(22)
20.82
20.82
23.Misc-3
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Lubricant (Mobil Oil)
0.010
ltr
500.00
5.00
Sub-Total(23)
5.00
5.00
70.Equipment-0
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
B.dozer/Roller/Comp:150HP
0.001
no.
6900.00
6.90
Sub-Total(70)
6.90
6.90
83.Labour-3a
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Head Man
0.002
no.
800.00
1.60
Labour, Unskill/ Ordinary
0.388
no.
550.00
213.40
Misc. Sundry-Lab Unskill/
0.004
no.
550.00
2.20
Sub-Total(83)
217.20
217.20
84.Labour-4
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Operator, Dozer/Roler/Com
0.001
no.
950.00
0.95
Sub-Total(84)
0.95
0.95
Total(1)
250.87
Add over head on Total(1)
3.5 %
8.78
Add Profit on Total(1)
10.0 %
25.09
Total(2)
284.74
Add VAT on Unit Price
7.5 %
23.09
Unit Price
307.82
Say
310.70
per cum