Return Main Menu

RHD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
08 Carriage
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
0810010 Carriage Mateial Head Load 0-50m pm/m
2.00
2.43
0810020 Carriage Mateial Head Load 0-100m pm/m
2.00
2.02
0810030 Carriage Mateial Head Load 0-250m pm/m
2.00
2.02
0810040 Carriage Mateial Head Load 0-750m pm/m
2.00
1.89
0811010 Carriage Material Cart within 1km m/km
213.00
260.84
0811020 Carriage Material Cart:2nd km abo m/km
46.00
56.28
0812010 Carriage Material Boat within 1km m/km
320.00
392.67
0812020 Carriage Material Boat 2nd km abo m/km
15.00
18.29
0813010 Carriag Material Truck within 1km m/km
302.00
370.37
0813020 Carriag Material Truck 2nd km abo m/km
11.00
13.19
0814010 Carriage Material Head Load:0-50m m3/m
4.00
4.93
0814020 Carriag Material Head Load:0-100m m3/m
4.00
4.32
0814030 Carriag Material Head Load:0-250m m3/m
3.00
3.91
0814040 Carriag Material Head Load:0-750m m3/m
3.00
3.78
0815010 Carriag Material Cart within 1km m3/k
424.00
520.73
0815020 Carriag Material Cart 2nd km abov m3/k
92.00
112.43
0815030 Carriag Material Boat within 1km m3/k
640.00
784.88
0815040 Carriag Material Boat 2nd km abov m3/k
30.00
36.96
0815050 CarriageMaterial Truck within 1km m3/k
601.00
737.88
0815060 CarriageMaterial Truck 2nd km abo m3/k
21.00
26.31
0818010 Carriage Brick Manual Lab 0-50 m th/m
5.00
6.14
0818020 Carriage Brick Manual Lab 0-100 m th/m
4.00
5.47
0818030 Carriage Brick Manual Lab 0-250 m th/m
4.00
4.93
0818040 Carriage Brick Manual Lab 0-750 m th/m
4.00
4.79
0819010 Carriage Brick by Cart within 1km th/k
531.00
650.97
0819020 Carriage Brick by Cart:2nd km abo th/k
115.00
140.64
0819030 Carriage Brick by Boat within 1km th/k
801.00
982.27
0819040 Carriage Brick by Boat:2nd km abo th/k
37.00
45.70
0819050 Carriage Brick by Truc within 1km th/k
752.00
923.00
0819060 Carriage Brick by Truc:2nd km abo th/k
27.00
32.98