Return Main Menu

WDB RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
0810010 Carriage of materials by head load including stacking in measurable stacks properly as per direction of Engineer in charge 0.00 m to 50.00 m. pm/m
2.00
2.43
0810020 Carriage Mateial Head Load 0-100m pm/m
2.00
2.02
0810030 Carriage Mateial Head Load 0-250m pm/m
2.00
2.02
0810040 pm/m
2.00
1.89
0811010 Carriage of materials by cart in all types of road, including loading,unloading and measurable stacking in stacks properly for every subsequent kilometer or part thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge. Within 1.00 km m/km
213.00
260.84
0811020 Carriage Material by Cart: 2nd km and above m/km
46.00
56.28
0812010 Carriage of materials by boat including loading, unloading and stacking properly in measurable stacks for every subsequent kilometer or part thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge m/km
320.00
392.67
0812020 Carriage of Material by Boat: 2nd km and above m/km
15.00
18.29
0813010 Carriage of cement, C.l. sheet, bitumen, M.S. rod, sheet pile of minimum 6.0m length etc. by truck in all types road, including loading, unloading and measurable stacks properly for stacking in every subsequent kilometer or part thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge Within 1.00 km m/km
302.00
370.37
0813020 Carriage of Material by Truck: 2nd km and above m/km
11.00
13.19
0814010 Carriage of sand, brickbats, shingles, boulders, c.c block, geobag, coal, timber etc. by head load including stacking in measurable stacks etc. complete (no carriage for 15m or part thereof) as per direction of Engineer in charge. 0.00 to 50.00 m m3/m
4.00
4.93
0814020 Carriage of Material by Head Load:0-100m m3/m
4.00
4.32
0814030 Carriage of Material by Head Load:0-250m m3/m
3.00
3.91
0814040 Carriage of Material by Head Load:0-750m m3/m
3.00
3.78
0815010 Carriage of sand, brick bats, shingles, boulders, c.c block, geo bag, coal, wood etc. from different field/ departmental stocks to work sites by truck! boat! cart including carriage by head load upto a distance of 30m at each point including loading, unloading and stacking at measureable work site (less in than 0.25m neglected) as per direction of Engineer in charge. By cart: Within 1.00 km. m3/k
424.00
520.73
0815020 Carriage of Material by Cart: 2nd km and above m3/k
92.00
112.43
0815030 Carriage of Material by Boat within 1.00 km m3/k
640.00
784.88
0815040 Carriage of Material by Boat: 2nd km and above m3/k
30.00
36.96
0815050 Carriage of Material by Truck within 1.00 km m3/k
601.00
737.88
0815060 Carriage of Material by Truck: 2nd km and above m3/k
21.00
26.31
0818010 Carriage of bricks (1000 nos) from one place to another by head load including stacking in measurable stacks etc. complete (no carriage for 15m or part thereof) as per direction of Engineer in charge. 0.00 to 50.00 m. th/m
5.00
6.14
0818020 Carriage Brick (1000) Manual Labaour 0-100 m th/m
4.00
5.47
0818030 Carriage Brick (1000) Manual Labaour 0-250 m th/m
4.00
4.93
0818040 Carriage Brick (1000) Manual Labaour 0-750 m th/m
4.00
4.79
0819010 Carriage of bricks (1000 nos) from one place to another including loading and unloading involving carriage by head load to a distance of 30 m at each loading and unloading point including stacking properly in measurable stacks etc. complete (less than 0.25 km be neglected) as per direction of Engineer in charge. By cart : Within 1.00 km. th/k
531.00
650.97
0819020 Carriage of Brick by Cart:2nd km and above th/k
115.00
140.64
0819030 Carriage Brick by Boat within 1km th/k
801.00
982.27
0819040 Carriage of Brick by Boat:2nd km and above th/k
37.00
45.70
0819050 Carriage Brick by Truck within 1km th/k
752.00
923.00
0819060 Carriage of Brick by Truck:2nd km and above th/k
27.00
32.98